Home > BusinessSEMI-SUBMERSIBLE HEAVY LIFT/CONSTRUCTION/ACCOMMONDATION VESSEL
SEMI-SUBMERSIBLE HEAVY LIFT/CONSTRUCTION/ACCOMMONDATION VESSEL
"TBN1"
Owner: OOS International
Class: ABS
Basic Design: Leenaars BV
Contract Signing:
Function: Be capable of lifting and positioning with 2x2,200t loads in the main cranes and provide 759 POB for accommodation service, DP-3 system.

 Hull

LOA

137.75m

Beam

81m

Height BL to Main Deck

43.55m

Scantlings Draft

35m

Max Operation Draft

26.4m

Operation Draft

20m

Surival Draft

17m

Transit Draft

10.5-11.0m

Displacement(Apporxat 20m Draft)

49,750t

Operation Variable

6,300t at 20m Operational Draft

Surival Variable

6,300t at Survival Draft

Transit Variable

5,500t at Transit Draft of 10.5m

Main Crane-Huisman

2xSWL 2,200t at 22m Radius

Hoisting Speed

3.5m/min

Max Radius

62m

Hook Travel

93m

Generator Set

Main Diesel Genset

8 x 4,825 kVA

Emergency Genset

1 x 1,850 kVA

Azimuth Thruster

Fixed Pitch Nozzled Propeller, Steer Able Type 6 x 3,800kW

Telescopic Access Bridge

Min Length of Access(Retracted)

31.5m(39-7.5)

Max Length of Access(Extracted)

46.5m(39+7.5)

Base Frame Dia

3,200mm

Dynamic Positioning - Kongsberg

DP3

Anchor System

In Addition to the DP3 Capability Based on 8 Anchors

Helideck

Westland EH101, Sikorsky S92 (or Equvatent)

Classification

A1 Column-Stabilized Unit, Crane Service, Construction & Maintenance Service, Accommodation Service AMS ACCU
DPS-3,ENVIRO-OS, UWILD,GP,CRC,HAB+(OS), EHS-P, SKP, PMP+ECG-SCR,ISQM,UK HSE