Business

Home > Business86M Soil Displacement Sand Piling Barge
86M Soil Displacement Sand Piling Barge
"SAN HANG SHA 7","SAN HANG SHA 8"
Owner: CCCC Third Harbour Engineering Co.,Ltd.
Builder: China Merchants Heavy Industry(Shenzhen) Co.,Ltd.
Class: CCS
Design: Shanghai Bestway Marine Engineering Design Co.,Ltd.
Delivered: Feb.2012
Function: The ship that is equiped with a spread mooring and positioning system is mainly used for the sand compaction pile driving operations under water.
Main Particulars

Hull

Length O.A.

75m

Breadth MLD

26m

Depth MLD

5.2m

Designed Draft

3m

Scantling Draft

3.5m

Pile Holder

Height

86m (Above Water Line)

Loading Capacity

120t

Tank Capacity

Bunker

2 x 225m3

Potable Water Tank

2 x 235m3

Working Water Tank

2,800m3

Generator Set

Main Genset

4 x 800 kW

Emergency Genset

1 x 130kW

Crane

Crab Crane

2 x 15T*13m

Mooring Equipment

Mooring Winch

6 x 300kN

Anchor

6 x 10,000kg Navy Type

DWT (Full Load)

2,250t

Endurance

30Days

Complement

36

Working Area

Coastal Area

Towable Area

Unrestriceted Area

Classification

* CSA, Pile Driving Barge, R2 for Operation , In-water survey